Steel Box Girder Bridge
Record-Breaking 6-Month Construction of Curved Steel Box Girder Bridge Nears Completion
2025.5.6 Rizhao city – Qingdao Zhuzhiyuan Steel Structure Co.,Ltd., a global leader in precision steel engineering, is proud to announce the near-completion of an innovative curved steel box girder bridge, a landmark project showcasing cutting-edge modular construction and unmatched efficiency. Built in just six months, this engineering feat exemplifies the synergy of advanced design and industrial precision.
Project Highlights
1. Revolutionary Box Girder Design
The bridge’s steel box girder system features a sleek curved profile, blending aesthetics with structural resilience. Its multi-layered steel framework—composed of interlocking horizontal and vertical elements—ensures load distribution efficiency and wind resistance, while the deep-gray corrosion-resistant panels highlight its industrial elegance.
2. Speed and Precision
From production to installation, the bridge was completed in just six months, a testament to Qingdao Zhuzhiyuan Steel Structure Co.,Ltd’s proprietary modular construction techniques. Pre-fabricated segments, including pre-welded trusses and galvanized panels, were precision-engineered for rapid assembly, minimizing onsite labor by 50%.
3. Urban Integration
Situated at a critical urban junction, the steel box girder bridge seamlessly integrates transit-oriented development (TOD) principles, linking high-density residential zones with commercial districts while maintaining structural synergy with the surrounding skyline. The bridge’s aerodynamic curved profile—engineered to meet AASHTO LT-14 load standards—optimizes wind resistance and visual cohesion, with its cold-formed box sections fabricated to BS EN 1090-2 compliance.
Currently in the final phases of structural assembly, the project highlights precision-engineered bolted connections and modular construction methodology. The bridge’s grid-truss system, supported by pre-stressed diaphragms, demonstrates advanced load distribution efficiency, while hot-dip galvanized coatings (HDG 850g/m²) ensure 50-year corrosion resistance. As the structure nears completion, it serves as a vital civic artery, streamlining urban mobility and reinforcing regional connectivity.
Current Progress
Structural Completion: Over 95% of the steel framework is installed, with crews finalizing welding and surface treatments. The bridge’s iconic curve, visible in the adjacent residential towers’ reflections, is now fully assembled.
Surface Finishing: Anti-corrosion coatings and fire-retardant finishes are being applied to ensure durability in urban environments.
Final Touches: Lighting systems and pedestrian walkways are slated for installation, ahead of the bridge’s grand opening.
Engineering Innovations
Modular Construction: Prefabricated in Qingdao Zhuzhiyuan Steel Structure Co.,Ltd.’s high-tech workshop (featured in the background of on-site images), the bridge’s components were designed for seamless integration, reducing waste by 30%.
Sustainability: Galvanized coatings (HDG 850g/m²) and recycled steel content (40%) ensure longevity and eco-friendly performance.
Smart Design: The box girder’s hollow section optimizes weight-to-strength ratios, enabling spans of up to 100 meters without intermediate supports.
Vision for the Future
This bridge is more than infrastructure—it’s a symbol of urban progress. Designed for adaptability, its modular system allows future expansions or conversions into mixed-use pathways, supporting the city’s evolving needs.
For over 16 years, Qingdao Zhuzhiyuan Steel Structure Co.,Ltd.has redefined steel engineering through innovations like the 6-month box girder bridge. Our expertise spans spatial structures, modular systems, and sustainable solutions, delivering projects that blend durability, beauty, and speed.